Lockheed Martin Aeronautics, Air Force Plant #4 (Fort Worth, Texas) — 50001 Ready

In 2017, the energy team at Lockheed Martin Aeronautics Air Force Plant #4, located in Fort Worth, Texas, learned about the U.S. Department of Energy's 50001 Ready program to achieve deeper and sustained energy and GHG savings. This case study from the DOE explores how the program was implemented and led to optimized energy use and related improvements.

Lockheed Martin Aeronautics, Air Force Plant #4 (Fort Worth, Texas) — 50001 Ready

In 2017, the energy team at Lockheed Martin Aeronautics Air Force Plant #4, located in Fort Worth, Texas, learned about the U.S. Department of Energy's 50001 Ready program to achieve deeper and sustained energy and GHG savings. This case study from the DOE explores how the program was implemented and led to optimized energy use and related improvements.

In 2017, the energy team at Lockheed Martin Aeronautics Air Force Plant #4, located in Fort Worth, Texas, learned about the Department of Energy’s 50001 Ready program to achieve deeper and sustained energy and GHG savings. Desiring to enhance their existing energy management efforts, which include a sophisticated in-house-developed energy control system, they were immediately interested in participating and reaping the benefits of this program.  

Lockheed Martin Aeronautics, Air Force Plant #4 (Fort Worth, Texas) — 50001 Ready is a case study that includes highlights of what it took for Plant #4 to implement a 50001 Ready Energy Management System and resulting improvements in production quality as well as elevated awareness among staff regarding energy use optimization and related impacts.

Download this case study to learn more about the success of the program:
Download

Advertise With Us ›

Up Next

SED Forum Spring

April 21-23, 2025 — Lost Pines, Texas

© Diversified Communications. All rights reserved.